The 90% Level Preliminary Survey and Engineering Plans are now completed. (To view click on the link located under Project Documents)
September 24, 2015
The 60% Level Preliminary Survey and Engineering Plans are now completed. (To view click on the link located under Project Documents).
June 6, 2015 Open House #2
Open House #2 for the Birch Bay Dr. & Pedestrian Facility Project was held from 10:00 am to 12:00 pm on Saturday, June 6, 2015 at the Birch Bay Bible Community Church at 4460 Bay Rd., Birch Bay, WA 98230.
November 8th, 2014 Open House #1
The Open House #1 was well attended by over 100 people. The links below will show the display posters used and community input generated at the meeting. A second Open House is planned for late spring, 2015.