The applicant is proposing a subdivision of 124 acres into one 98 acre non-residential tract to be owned and operated by the Whatcom Land Trust and 16 residential lots with associated infrastructure including roads, stormwater and fire. Public water is proposed to be provided by the City of Bellingham. The lots will be served by individual onsite septic systems. A float, pier and gangway will be constructed on Pleasant Bay and improved gravel paths and an 800 square foot storage and bathroom building will be constructed within 200 feet of the shoreline.
PDS is review the application and adding additional documents. The "Preliminary Draft Exhibits" tab below will be updated as additional documents are received and updated.