Location: West Badger Road at Bertrand Creek located approximately 1-mile west of Guide Meridian (SR 539).
Project Details: This project consists of replacing an existing 69-foot channel girder bridge on timber caps and piles. Work will also include approach slabs, roadway approach work and guard rail installation.
Project design, permitting and real estate work is complete and construction of this project is expected to begin in June 2019 and continue through December 2019.
Funding: $1,430,008 in Federal bridge funds have been obtained for construction of this project. Remaining funds needed to complete the project will come from the road fund.
Traffic Limitations: West Badger Road will be closed at this location during construction starting in June, 2019 and continuing through December, 2019. A signed detour will be in place during construction which will utilize Berthusen Road, Loomis Trail Road and Weidkamp Road for local traffic. The truck detour will include Guide Meridian (SR 539), Birch Bay Lynden Road and Sunrise Road.
Engineering Manager
360-778-6264
[email protected]
322 N Commercial Street
Suite 301
Bellingham, WA 98225
Phone: 360-778-6210
Fax: 360-778-6211