Skip to Main Content
Loading
Loading
How Do I?
Your Government
County Services
Safety & Justice
Home
Your Government
Departments
Public Works
Public Works Projects
Swift Creek
Swift Creek Background Documents
Swift Creek Background Documents
Swift Creek Sediment Management Action Plan Documents
The following provides background information related to the SCSMAP:
Final Supplemental EIS for Swift Creek Repository
Sumas Mountain/Swift Creek Asbestos Cluster Investigation
.
Draft Supplemental EIS for Repository
Draft EIS Appendices.
SEPA Determination of Significance and Request for Comments on Scope
69 SCSMAP
69P1_SCSMAP Phase 1 Projects (PDF)
69P2_SCSMAP Phase 2 Project proposal (PDF)
69P2A_Phase 2 Appendix A (PDF)
69P3_SCSMAP Phase 3 Project proposal (PDF)
79_E&E Swift Creek Removal Options Report (PDF)
28_E&E Swift Creek Repository Evaluations (PDF)
80_Swift Creek Area Gravel Pits Figure (PDF)
55_Draft Environmental Impact Statement (DEIS) (PDF)
55A_DEIS Appendix A (PDF)
55B_DEIS Appendix B (PDF)
55C_DEIS Appendix C (PDF)
55D_DEIS Appendix D (PDF)
55E_DEIS Appendix E (PDF)
55F_DEIS Appendix F (PDF)
56_Final Environmental Impact Statement (FEIS) (PDF)
56A1_FEIS Appendix A Part 1 (PDF)
56A2_FEIS Appendix A Part 2 (PDF)
56A3_FEIS Appendix A Part 3 (PDF)
56B_FEIS Appendix B (PDF)
56C_FEIS Appendix C (PDF)
56D_FEIS Appendix D (PDF)
56E_FEIS Appendix E (PDF)
66_Sediment Repository Conceptual Site Screening
66A_Appendices
01_Converse-Davis-Dixon Final Geotechnical Report
01a_Converse-Davis-Dixon Maps 1
01b_Converse-Davis-Dixon Maps 2
02_77e23 Sumas River, Swift Crk Drainage Asbestos Fiber Source Investigation
03_Schreier Taylor 1980 Asbestos fibres in receiving waters. Eniro Canada Inland Waters Directorate
04_Schreier Taylor 1982 Variations and mechanisms of asbestos fibre distribution in stream water
05_Schreier Nguyen 1984 Link Trace metals with asbestos fibre, rural enviro affected by ser sedi
06_Schreier Fibers Trace Metals 1987 Asbestos fibres introduce TM into streamwater and sediments
07_Schreier Trace Metals Fish 1987 in fish exposed to asbestos rich sediments
08_Schreier Sediment Weathering processes of asbestos-rich sediments
09_Landau Swift Creek Investigation Report
10_Blake 04 91 Swift Creek asbestos health risk analysis
11_Benda 1992 Slope stability analysis of Sumas Mountain
12_NWAPA 1995 Swift Creek Section Sample Asbestos
13_WCHD Letter 1997 Memorandum to TH
14_Cascade Env. 1998 Swift Creek fish habitat survey
15_GeoEngineers 1998 Stream management
16_ GeoEngineers 1998 Supplement Swift Creek Stream Management Plan Supplement
17_GeoEngineers 1998 Phase 1 Memo To Whatcom County
18_USGS WRI Report 98-4195 Hydrogeology, Ground-Water Quality and Sources of Nitrate in Lowland Glacial Aquifer of WC and BC
19_ USGS Open File Report 99-244 1 Hydrogeology, Ground-Water Quality Data Abbotsford-Sumas Aquifer SW, BC and NW WA
20_Soil Metals Concentrations observed in Swift Creek
21_BGC 2005
21a_BGC appendix
22_Landl Consultation 2005
23_DOH Swift Creek Health Consultation Mar2006
24_EPA Letter to Bruce Roll 6-30-06
25_2007 EPA Letter to Pete Kremen
26_Correspondence Whatcom County and US Army Corps of Engineers 2007
27_Summary of EPA Activities 2-9-07
29_Integral Swift Creek Memo 2007
30_EPA Swift Creek Fact Sheet Feb07
31_EPA Pollution Report 2007
32_EPA March20-08 NOA fact sheet
33_Hart Crowser Swift Creek Planning Level Cost Est Report May2008
34a_KWL Background Report Jan2008
34b_KWL Appendices
35_Wa Dept Health Publication 334-162 2008
36_DOH Swift Creek Health Consultation Update Feb2008
37_Whatcom County Interim Sediment Mgt Assessment Plan Oct2008
38_Bennett Groundwater Investigation Report 06-09
39_WCHD Ecology Facility Site Inspection Report 5797429 2009
40_Whatcom County letter to property owners with background info 2009
41_US EPA 2009 Soil Sediment Water Sampling Report
42_Schreier Changes in sediments in Sumas River 2009
43_GeoEngineers Swift Creek GeoTech Report May 2010
44_GOLDER Air and Sampling FINAL 2010
45_NHC Swift Creek Baseline Hydraulic Analysis Oct2010
46a_PSE Sumas Mtn Interim Alternatives Analysis Report Apr2010
46b_PSE Sumas Mtn Alternatives Analysis Report Addendum Jun2010
47_EPA Sumas Mtn Asbestos Monitoring Report April2011
48a_DOH Sumas Mtn Swift Creek Cluster Investigation 2010
48b_DOH Summary 334-225
49_Swift Creek Sediment Mgmt Phase 1 PSE Design-20110330
50_Assess 1yr Status Report 2011 EPA Presentation
51_Sumas Mtn Cyphert et al. 2012
52_EPA Swift Creek Sample Plan Jul2012
53_EPA Swift Creek Data Tables 8Nov2012
54_AESI SSSP Sumas Mountain Asbestos Oct2012
57_E&E EE-CA
58_1971 USA Corps memos
59_1998 Corps letter
60_1998 HPA
61_WC Asbestos Procedure
62_DOH Cluster Investigation
63_Joint Agency Agreement Mar2014
64_North Fork Re-Route
65_USGS sediment report sir20155177
66_Repository Site Screening Final
66a_Repository Site Screening Appendices
67_EPA Wroble sampling article
68_Millman Temp Est Signed
70_E&E Goodwin Property Report
70abc_E&E Goodwin Property Report App A B C
70d_E&E Goodwin Property Report App D
70e_E&E Goodwin Property Report App E
70fg_E&E Goodwin Property Report App F G
71_1978 WC-Sen Jackson and Magnuson-Corps
72a_WC & Flood Control 1957 original dredge agreement
72b_1957 map
73_US Army Corps conversation record with El Paso Gas Co Mar1971
74_WC Resolution March 8 1971
75_US Army Corps Levee Eligibility Inspection 2009
76_1976-77 1985 Photos by EPA Staff
77_WA Dept Health Asbestos and Metals in Groundwater and Leachate
78_Letter from Wash DOT regarding use of material 2007
81_1995 permit and correspondence US Army Corps of Engineers
Swift Creek Background Documents
Arrow Left
Arrow Right
[]
Slideshow Left Arrow
Slideshow Right Arrow