- Home
- Your Government
- Departments
- Public Works
- Public Works Projects
- Jackson Road Bridge No 81 Replacement Project
Jackson Road Bridge No 81 Replacement Project
Jackson Road Bridge Location:
Project Summary
This project will replace the older 2-span 62-foot Jackson Road Bridge, which is nearing the end of its service life with a new single span bridge over Terrell Creek.
Project Status
The project is currently in Phase 1, which includes:
- Topographic Survey/Site Reconnaissance
- Preliminary Engineering
- Community Engagement
- Type, Size, & Location Analysis
Anticipated Project Timeline
- Phase 1 - Topographic Survey, Preliminary Engineering, and Type, Size, & Location Analysis (Current Phase).
- Phase 2 - Detailed Design & Permitting (2023-2025).
- Phase 3 - Construction (TBD).
Project Updates
We plan to hold a public meeting in spring 2025 to present our Jackson Road Bridge alternatives. Be on the lookout for upcoming engagement opportunities, and make sure to sign up for project updates (directions below).
Project Update Video--August 2022.
Public Participation
We want your help and input as we design what the next bridge will look like. Information gathered from the public will help us develop alternative bridge designs as we move forward. Public participation will come from virtual open house-style events and an online survey.
Virtual Open Houses
Two virtual open houses are planned to provide opportunities for public input on bridge features, size, aesthetics, traffic modifications, and temporary construction impacts.
- The first open house was held on Feb. 3, 2021.
- The project was temporarily put on hold while Whatcom County Public Works responded to the historic 2021 flooding events.
-
Bridge Replacement FAQ's Available on Project Website
The Jackson Road bridge replacement project webpage now has a frequently asked questions section, online survey available for the public to comment. Read on...
Sign Up for Project Updates
Using the Notify Me system, you can sign up to get notifications by text or email whenever we have project updates to share.
How to sign up to receive email and/or text notifications:
- Go to the Notify Me section of our website.
- Type in your email address and phone number under the Your Profile Information section at the top of the page.
- Scroll down to News Flash, find the News Flash item labeled Public Works – Jackson Road Bridge Replacement Project.
- Click on either the envelope icon and/or the phone icon, depending on your preferences. The envelope icon will send you emails, and the phone icon will send you text messages.
- Finally, you will get an email or text message from Civic Plus (depending on which icon you clicked on in Step 4 asking you to confirm your subscription. Click on the link in this email to confirm your subscription.
Quarterly Budgets
- 2022 1st Quarter Project Based Budget
- 2022 2nd Quarter Project Based Budget
- 2022 3rd Quarter Project Based Budget
- 2022 4th Quarter Project Based Budget
- 2023 1st Quarter Project Based Budget
- 2023 2nd Quarter Project Based Budget
- 2023 3rd Quarter Project Based Budget
- 2023 4th Quarter Project Based Budget
- 2024 1st Quarter Project Based Budget
- 2024 3rd Quarter Project Based Budget
- 2024 4th Quarter Project Based Budget
- 2025 1st Quarter Project Based Budget
- 2025 2nd Quarter Project Based Budget
Funding
- Phase 1 of the project is funded from the County's Road Fund.
Contact Us
-
Alen Ohan
Project Engineer
360-815-8046
[email protected]322 N Commercial Street
Suite 301
Bellingham, WA 98225
Phone: 360-778-6210
Fax: 360-778-6211 -
James Lee
Engineering Manager
360-778-6264
[email protected]
322 N Commercial Street
Suite 301
Bellingham, WA 98225
Phone: 360-778-6210
Fax: 360-778-6211
Project Overview
- Status: Phase 1, which includes preliminary engineering, surveys, & location analysis.
- Next Steps: Detailed design & permitting.
- Schedule: construction TBD