The record-breaking rain and devastating flooding we experienced in November 2021 caused widespread damage and devastation, especially to people who live in the Nooksack River flood overflow corridor including the communities of Everson, Nooksack, and Sumas. People are understandably concerned and looking for what can be done to minimize the risk of this happening again. Some are advocating for dredging the river as the principal way to prevent future flooding, yet experience has shown that this has environmental impacts and likely will not provide the relief people want to see.
Dredging (or, more accurately, gravel removal), will not by itself prevent flooding. To have any sort of meaningful impact on the kind of flooding we saw in November 2021, vast amounts of sediment would need to be removed. It could actually increase flood risk in other areas. These impacts must be carefully considered and compared against other flood reduction methods that may be more effective and protect more people overall. While gravel removal alone will not prevent flooding, it is not off the table and could be an effective method to reduce flood risk in certain situations when used alongside other flood prevention methods.
The following Frequently Asked Questions regarding gravel removal provide information on what it is and why it is not the principal solution to reduce Nooksack River flood risk.
Dredging is the removal of sediments from the bottom of lakes, rivers, harbors, and other bodies of water. These sediments can include gravel, sand, silt, and clay. Dredging usually implies the removal of sediment from below the water surface and is often done in water bodies to allow for navigation. The Nooksack River has not been dredged in this manner in recent history.
In the past, gravel and sand were removed from exposed bars along the river above the water line. This type of sediment removal, often called gravel bar scalping, was conducted by various commercial gravel companies from approximately the 1960s until the mid to late-1990s. This work was not performed as a flood reduction effort. It was done to provide gravel as a commercial aggregate (gravel) source and for adjacent landowners.
No. Gravel bar scalping did not prevent flooding in November 1990 in the Everson, Nooksack and Sumas areas, when one of the biggest floods to date caused widespread damage, nor did it prevent flooding in 1989 and 1995. See: Floods of November 1990 in Western Washington, U.S. Geological Survey
Gravel bar scalping by commercial gravel companies stopped in the late 1990s. This was due in part to increased permitting requirements including a mid-1990s ruling that federal and state permits would be needed to ensure protection of water quality under the federal Clean Water Act. This was followed in by the 1999 listings of Chinook salmon and bull trout, and the 2007 listing of steelhead as threatened under the Federal Endangered Species Act (ESA). The increased permit scrutiny, mitigation and monitoring requirements, and the extra handling costs needed to transport scalped material to an upland stockpile location all contributed to increased costs of scalping to the point where it was not commercially viable compared to mining from nearby sand and gravel pits.
The Nooksack River transports a tremendous amount of sediment. It’s estimated to carry 1.4 million tons of sediment (including gravel, sand, and silt) per year (source: USGS Fact Sheet 2011-3083 Sediment Load from Major Rivers into Puget Sound and its Adjacent Waters). How gravel moves through a river system is not well understood. River systems are dynamic and there currently are no computer models that can predict how sediment moves during and between floods with any degree of reliability, though research is currently underway at the University of Washington. The river’s response to weather events and human intervention is not always predictable. If actions are taken without a thorough understanding of river processes, unintended consequences may result. If the river is starved of gravel in one reach because too much gravel was removed, it may result in more erosion downstream as the river has the ability to carry more sediment. What is certain is that gravel removal can have significant impacts on fish habitat.
We have studied it a number of times over the past few decades. Most recently, in 2013, Whatcom County sponsored a gravel removal pilot study to look at the potential benefits of gravel removal. The results of this study showed that gravel removal would produce negligible reductions of flood levels even at smaller flood flows. Other studies have shown that other factors, such as constrictions along the river corridor, may have a much greater effect on flood heights than gravel accumulation. Opening up the constrictions on the river and reconnecting floodplains would also provide opportunity for ecosystem recovery and salmon habitat improvements.
While gravel removal is not likely to be the primary tool for reducing flood levels, it may play a role in helping reduce the rate of channel infilling if the science shows these trends are continuing over time. Any projects to remove gravel would need to be developed in a manner that does not harm fish or their habitat and ideally, that improves and enhances habitat, so they may not look like the gravel bar scalping projects done in the past.
Removing gravel from any river or stream requires permits from local, state, and federal agencies. The U.S. Army Corps of Engineers (USACE) is the lead federal agency who reviews and approves permits to remove river gravel. The USACE consults with the U.S. Fish and Wildlife Service and the National Marine Fisheries Service on impacts to any Point Elliot Treaty-protected salmon species, including the three species listed as threatened or endangered under ESA. The USACE is also required to consult with local tribes. The Washington Department of Ecology issues approvals related to protecting water quality. The Washington Department of Fish and Wildlife issues a Hydraulic Project Approval with conditions necessary to protect aquatic life. Whatcom County Planning and Development Services reviews permit applications for compliance with local codes such as Clear and Grade, Shorelines and Critical Areas. Each permitting agency conducts their own reviews and consults with outside agencies as is necessary before issuing their permit. Each permitting agency may require mitigation for impacts that may occur although a single mitigation plan can satisfy multiple permitting agency requirements. The permitting process could take 1-2 years or more depending on the specifics of the proposal.
Yes. Increases in river channel capacity that can result from gravel removal in one location may send more water downstream and result in more impacts in areas such as Lynden, Ferndale, and the Lummi Reservation. Those potential impacts would need to be evaluated to make sure we are not transferring risk from one community to another.
In addition, removing gravel in one spot may increase bank erosion and result in scour around bridges, roads, pipelines, or fields in other locations. If too much gravel is taken out over time, infrastructure such as levees, bridges, and pipelines can be undermined.
Removing gravel from the Nooksack River can negatively affect fish and fish habitat, including that of three Treaty-protected species on the Endangered Species Act list: Nooksack steelhead, Chinook salmon, and bull trout. A gravel removal project may prompt the need for an Environmental Impact Statement through the State Environmental Policy Act (SEPA) and/or the National Environmental Policy Act (NEPA) to determine what impacts, either detrimental or beneficial, may occur. The applicant would need to demonstrate that any detrimental impacts are fully mitigated and that impacts to the threatened species will not occur.
Managing flood risk requires that we use all the tools at our disposal to reduce harm to people and property throughout our entire community. Single-tool solutions most often transfer risk to others downstream. Tools to reduce harm during a flood include:
These are some of the potential actions that are being investigated to better understand their benefits, potential adverse impacts, costs and long-term effectiveness as part of the Floodplain Integrated Planning (FLIP) process.
Past sediment management studies are linked on the Completed Nooksack River Plans & Studies page.